Execution planing

Baubesprechung im Heimatmuseum

Construction meeting at the local museum.

Photo: K.-D. Uhden

from left: L. Manleitner, H.-J. Leue, D. Ehlke, St. Pieper, K. Hackbarth, H. Minkus

Construction team

Dipl.-Ing. K.-D. Uhden, Project management TELESCOPIUM-Lilienthal gGmbH

Dipl.-Ing. H.-J. Leue, Technical management

Dipl.-Ing. H. Minkus, Construction drawings

Dipl.-Ing. St. Pieper, Architectural firm adp

Dipl.-Ing. K. Hackbarth, Architectural firm adp

L. Manleitner, Machines & Tools

Dennis Ehlke, Construction Drawings of Mechanical Components

Construction Drawings

Lifting Gear, Dipl.-Ing. H. Minkus

Revolving stage (gallery), Dipl.-Ing. H. Minkus

Gallery beam structure, adp pieper design

Section A-A, adp pieper design

Tube, Dipl.-Ing. H. Minkus

Staking sketch, Ing.-Büro Thorenz & Bruns

Cover for laser alignment and solar filter, Hand sketch Dipl.-Ing. H.-J. Leue / Finished drawing Dipl.-Ing. Minkus

adjustment mechanism of the refractor, Hand sketch Dipl.-Ing. H.-J. Leue

Refractor-test with Solarmax-filterset, Photo H.-J. Leue

Secondary mirror sled, Dipl.-Ing. H. Minkus, template 15 cm Telescope H.-J. Leue

Eyepiece sled, Dipl.-Ing. H. Minkus, template 7-foot Telescope by Schrader, Nachbau H.-J. Leue

Primary mirror cell, Dipl.-Ing. H. Minkus, template 12-inch-Telescope, H.-J. Leue

Construction details